NYC Building Report

Brooklyn Bay Ridge

162 68 Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-05861-0031), so they can include other buildings on the same lot.

6 records

Date Class Status Apartment Summary
Dec 27, 2023 A VIOLATION CLOSED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Dec 27, 2023 B VIOLATION CLOSED 1STFLO § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 27, 2023 B VIOLATION CLOSED 1STFLO § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 27, 2023 A VIOLATION CLOSED 1STFLO § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQUARE FEET AT THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 27, 2023 B VIOLATION CLOSED 1STFLO § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT THE CEILING, IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Dec 27, 2023 B VIOLATION CLOSED 1STFLO § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH