| Sep 14, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURAL PEER REVIEW.REVISD DQGS TO STBLZE THE BLDG SUBMITTD BY NYSPE #068504 VIA EMAIL TO DOB FEU ON 12/23/25,1/26/26,2/12/26,7/17/26 &8/5/26 WERE INCMPLTE,DEFICIENT&NOT CODE COMPLIANT.1.OWNR TO PRVDE NAMES OF NYSPE STRCTRL ENG IN GOOD STANDNG W/KNOWLEGDE & EXP OF SIMILAR STRCTRE BY 9/21/26 |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 14, 2024 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 28, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.FRNT(EXP1)APT &2NDFL&BOTH APTS ON 3RDFL HAVE BEEN FULLY GUTTD W/O PERMITS W/ALL FL JOISTS EXPOSD&SUNFLOOR REMVD.WOOD JOISTS&BEAM INSTLLD IN CELLAR ALONG EXP4END OF JOISTS W/O PERMITS.COMPLY WITH DOB VIOLATION #121823FEU31604BS(CONTROL #343267)IMMEDIATELY |
| Jun 24, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.EXP4WALL OF REAR ATTCHD GARAGE PRTLLY CLLPSD&DISLODGED OUTER WYTHE OF BRCK@EXP4WALL OF MAIN BLDG.GARAGE MISSNG ENT ROOF &MOST ROOF JOISTS &HAS CRCKS@REMAINING WALLS.OUTER WYTHE OF BRCK POORLY CNNCT.FAIL TO COMPLY W COMMISH ORDR DOB#121823FEU31603BS REQUIRED REPRS FOR REAR GARG COMPLTD 4/15/24.AS OF 6/24/24 NO PRMT |
| Apr 15, 2024 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Jan 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.EXP4WALL OF REAR ATTACHD GARAGE PARTIALLY CLLPSD & DISLODGED OUTER WYTHE OF BRCK@EXP4 WALL MAIN BLDG ON 12/18/23OUTER WYTHE OF BRCK POORLY CORRECTD TO INNER WYTHES W/DIAGONAL HEADERS OBTAIN PERMIT TO LEGALIZE WORK COMPLETED W/O APPROVED MEANS&METHODS IMMEDIATELY. ALL REMAINING WRK TO BE DONE UNDR PERMIT |
| Dec 19, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL 40' LINEAR FT CONST FENCE ALONG THE PUBLIC SIDEWALK FROM EXTERIOR BLDG WALL TO CURB & RETURNING BACK 5' LINEAR FT AWAY FROM REAR OF THE COLLAPSED GARAGE ALONG THE PUBLIC SIDEWALK AT EXP-4 AND FOR 5' FT OF PROTECTION FOR ADJACENT VACANT LOT 315 MARION STREET |
| Dec 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.FRNT(EXP1)APT &2NDFL&BOTH APTS ON 3RDFL HAVE BEEN FULLY GUTTD W/O PERMITS W/ALL FL JOISTS EXPOSD&SUBFLOOR REMVD.WOOD JOISTS&BEAM INSTALLD IN CELLAR ALONG EXP4END OF JOISTS W/O PERMITS.1.NYS PE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS, 2.FILE FOR RPAIRS BY 4/1/23,3.OBTN PRMTS&STRT WRK BY 4/15/24 |
| Dec 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.EXP4 WALL OF REAR ATTACHD GARAGE PRTLLY CLLPSD&DISLODGED OUTER WYTHE OF BRCK@EXP4 WALL OF MAIN BLDG.GARAGE MISSNG ENT ROOF&MOST ROOF JOISTS&HAS CRCKS@REMAINING WALLS.OUTER WYTHE OF BRCK POORLY CNNCT 1.NYS PE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 1/29/24,3.OBTN PRMT&STRT RPAIRS BY 2/1/24 |
| Dec 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.EXP4WALL OF REAR ATTACHD GARAGE PARTIALLY CLLPSD & DISLODGED OUTER WYTHE OF BRCK@EXP4 WALL MAIN BLDG ON 12/18/23 OUTER WYTHE OF BRCK POORLY CORRECTD TO INNER WYTHES W/DIAGONAL HEADERS 1.IMMED INSTALL TEMP SHORNG&BRACNG AS REQ'D PER NYS PE STRCTRL ENGNEER &RMVE UNSTABLE PORTIONS OF BRCK@EXP4 WALL GAR |
| Dec 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.EXP4WALL OF REAR ATTACHD GARAGE PARTIALLY CLLPSD & DISLODGED OUTER WYTHE OF BRCK@EXP4 WALL MAIN BLDG ON 12/18/23 OUTER WYTHE OF BRCK POORLY CORRECTD TO INNER WYTHES W/DIAGONAL HEADERS 1.IMMED INSTALL TEMP SHORNG&BRACNG AS REQ'D PER NYS PE STRCTRL ENGNEER &RMVE UNSTABLE PORTIONS OF BRCK@EXP4 WALL GAR |
| Dec 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.ENTIRE EXP4 WALL OF GARAGE PARTIALLY COLLAPSD&DAMAGED EXP4 WALL OF MAIN BLDG&EXP3 WALL OF GARAGE.EXP4 WALL OF MAIN BLDG HAS APPRX 8LINEAR FT OF OUTWRD BULGD BRCK@OUTER WYTHE BETWEEN 1ST&2NDFLRS@ EXP3/4 CORNER OF BLDG.IMMED INSTALL TGHTBRD FENCE TO ENCLOSE 1STFL OF SDWALK ALONG EXP4 TO CLOSE OFF 45 LINEAR FT OF SDWALK APPRX 5FT |
| Mar 1, 2013 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Nov 16, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |