| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Mar 6, 2009 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBTAIN A PERMIT,MAKE SAFE,PROVIDE THE DOB WITH ENGINEER'S REPORT FOR STRUCTURAL STABILITY |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 18, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH STOP WORK ORDER ON 5/11/07 SWO 051107C061DR ISSUED. 4TH FL GUTTED,FRAMING,PLUMBING,ELECTRIC APPROX. 30% W/O PERMIT ILLEGAL WORK IS CONTINUING TO APPROX 85% COMPLETED WITHOUT SWO LIFTED PERMIT OBTAINED 6/13/07. REMEDY: STOP ALL WORK. COMPLY WITH STOP WORK CONTACT DEPT. OF BUILDINGS TO PROPERLY RESCIND STOP WORK ORDER |
| May 11, 2007 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT NOTED:4TH FLOOR,APT# 7.GUT REHAB IN PROGRESS & REFRAMING OF PARTITION WALLS AND SHEETROCK WALLS INSTALLATION APPROX 30% OF WORK COMPLETED.NOTE:INSTALLING NEW PLUMBING & ELECTRICAL LINES REMEDY:STOP ALL WORK IMMEDIATELY,OBTAIN PERMITS |