Brooklyn Midwood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 1, 2022 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Apr 29, 2021 | V*-DOB VIOLATION - DISMISSED | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Apr 29, 2015 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 13, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 24, 2009 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Jun 17, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO ADEQUATELY SUPPORT ADJOINING GROUNDS AFFECTED BY EDUCATION SOIL LOSS DUE TO INSTALLATION MOVEMENT OF CANTILEVER SHORING AT LOT LINES OF EXPOSURES 3 & 4 HAVE CAUSED MODERATE/SEVERE SETTLEMENT/CRACKI NG OF ADJOINING CONCRETE . PARTIAL RESCIND OF SWO REMEDY: PROVIDE IMMEDIATE BACKFILL FOR SUPPORT OF ADJOINING GROUND |
| Apr 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO ADEQUATELY SUPPORT ADJOINING GROUND AND/OR STRUCTURES AFFEC TED BY EXCAVATION SOIL LOSS DUE TO INSTALLATION/MOVEMENT OF CANTELEVER SHORING AT LOT DUE TO INSTALLATION MOVEMENT OF CATELEVER SHORING AT L OT OF EXPOSURE 3 AND 4 HAVE CAUSED MODERATE SEVERE SETTLEMENT CRACKING REMEDY: STOP ALL WORK SUBMIT PE REPORT AND PLANS FOR IMMEDIATE REPAIR |
| Jan 31, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED PLANS NB310906524 NOTED: EXCAVATED SOIL REMOVED FROM APPROX 200'X100' AREA 20 APPROX DEPTH AVAILABLE COPY OF LOOSE SHEETS OF PERFORATED PLANS XEROX COPYS PLAN SHOW STEEL RAKER BRACING TO PLACE THRU-OUT NO RAKERS WAILERS OR ALTERNATE SUPPORT OF EXCAVATION AREA PROVIDED REMEDY: STOP ALL WORK EXCEPT TO PROVIDE ANGL |