Brooklyn Bedford-Stuyvesant (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 27, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT 25 LINEAR FEET OF SIDEWALK SHED AT THE FRONT OF BUILDING TO SAFE GUARD THE PEDESTRIANS FROM FALLING DEBRIS |
| Jul 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ENGINEERS REPORT REQUESTED DUE TO DMGED WALL, DMGED MASONRY FACADE @ E XP 1 AND DMGED DOORS DUE TO VEHICLE IMPACT OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.G OV W/IN 3 DAYS ADDRESSING ALL CONDS W/PLANS, PHOTOS, AND ESTIMATED TIM EFRAME FOR REPAIRS TO BE COMPLETED |
| Jul 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTUTRE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED A DAMAGED MASONRY FACADE AND WALL DUE TO VEHICLE IMPACT. ALSO OBSERVED BROKEN GLASS AND BROKEN DOOR FOR FIRST FLOOR LOBBY AND COMMERCIAL SPACE DOING BUSINESS AS "NOIR YOGA". |
| May 2, 2024 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 7, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 3-STY BLDG PARTLY DEMO'D CONTRARY TO APPROVD DOCS. BLDG STRUCTURALLY COMPROMISED. APPROX 25' UNBRACED WALLS, UNDERPINNING PRESENT, DISTURBD SOIL AT INT COLUMN PIERS REMEDY: COMPLY W. CODE, HIRE NYS PE TO SUBMIT PLAN,SUPERVISE&INTERPRET MONITORING, INSTALL EQUIP,TAKE BASELINES BY 9/25.TAKE DAILY READINGS |
| Sep 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 3-STY BLDG PARTLY DEMO'D CONTRARY2APPRD DOCS,BLDG STRUCTRLY COMPROMSD APRX 25FT. UNBRACED WALLS, UNDERPINNG PRESENT,DISTURBED SOIL AT INTER COLUMN PIERS REMEDY: COMPLY W.CODE, HIRE NYS PE 2 PERFORM DAILY STRUCTURAL STABILTY INSPECTIONS |
| Sep 22, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMER WRK,3 STORY PARTLY DEMO'D CONTRARY 2 APPROVD DOCS.BLDG STRUCTURLY COMPROMISED.APRX 25 FT UNBRACED WALLS. UNDERPINNING PRESENT DISTURBED SOIL AT INT COLMN PIERS. REMEDY: COMPLY W CODE,HIRE NYS PE, CS & GC TO STABILZE BLDG,SAFEGUARD SITE,ADJ PROP&PUBLIC.F/T PE&CS SUPERVSN,START BY 9/25/23 |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Mar 16, 2005 | V%*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Apr 11, 2003 | V%*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 4, 2002 | VP*-VIOLATION UNSERVED ECB- DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Jun 2, 2002 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |