NYC Building Report

Brooklyn Bedford-Stuyvesant (East)

1561 Fulton Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Feb 4, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE BOROUGH COMMISSIONER HAS STOPPED ALL WORK ON 03/04/25 FOR APPLICATION #321834574 DUE TO APPLICANT WITHDRAWAL.
Feb 4, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE BOROUGH COMMISSIONER HAS STOPPED ALL WORK ON 03/04/25 FOR APPLICATION #321834574 DUE TO APPLICANT WITHDRAWAL
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Mar 11, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMM. HAS ORDERED ALL WORK STOP IMMEDIATELYUNDER APPL.#3218345 65 DUE TO APPL. WITHDRAWAL/STOP ALL WORK MAKE SITE SAFE
Mar 11, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMM. HAS OREDERED ALL WORK STOPPED IMMED. UNDER APPL#32183456 5 APPL. WIHDRAWAL/STOP ALL WORK MAKE SITE SAFE
Dec 30, 1991 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL