| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Oct 1, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jul 21, 2000 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Nov 20, 1998 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: INSTALLED NEW PLUMBING AT 2ND, 3RD & 4TH FL LEVELS. NEW CEILING ARE ERECTED AT 2ND, 3RD & 4TH FL LEVELS PARTITION WALLS WERE DEMOLISHED AT 2ND & 3RD FL LEVEL, & NEW ELECTRI- CAL WIRING INSTALL THROUGHOUT BLDG. REMEDY: STOP ALL CONSTRUCTION WORK. OBTAIN PLANS AND PERMIT WHERE FEASIBLE |
| Jan 20, 1998 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: NEW CEILING INSTALLED STOP ALL CONSTRUCTION WORK FORTH WITH. REMEDY: MAKE SITE SAFE STOP ALL WORK OBTAIN PERMITS AND APPROVALS NECESSARY FOR DOB CONTACT |
| Feb 22, 1994 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Dec 15, 1993 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |