Brooklyn Greenpoint
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 6, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDER NONCOMPLIANCE. REPORTING TO AN INCIDENT OF A FIRE ON THE 3 FLOOR OF A 4 STORY NFP BUILDING WITH 13 APARTMENTS. FIRE STARTED IN APARTMENT 10 AT REAR OF BUILDING. UPON INSPECTION OF PREMISE OBSERVED THAT SECTION OF ROOF OPEN TO THE ELEMENTS ALSO SKYLIGHT WAS REMOVED AND OPENED TO THE ELEMENTS AS WELL. |
| Nov 6, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED FIRE ESCAPE AT EXPOSURE 1 STATE OF THIS DISREPAIR. SECTION OF FIRE ESCAPE LANDING HAS BEEN BENT UPWARD AND HAS PARTIALLY DETACHED FOR STRUCTURE AT 2 & 3 FLOOR. COMPROMISING SECONDARY MEANS OF EGRESS FOR APARTMENTS 5,8,AND 11 AT EXPOSURE 1 FRONT OF BUILDING. |
| Nov 6, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT APT 10, WALLS OPEN IN SEVERAL ROOMS, CHARRING OF JOISTS,WINDOWS OUT. IN APT 13 FIRE FIGHTING OPERATIONS HAVE OPENED HALLWAY CEILING IN 2 ROOMS. NO STRUCTURAL ISSUES OBSERVED. |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |