Brooklyn Flatbush (West)-Ditmas Park-Parkville
1525 Dorchester Road, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Dec 2, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 16, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM BLDG. BRICK FACADE WALL @ SOUTH-WEST CORNER IS CRACKED @ ALL FLOORS & THE CRACKS ARE COSMETICALLY PATCHED.THE CORNER IS LIKELY SETTLED UNEVENLY EVIDENCED BY TWISTED WINDOW FRAMES & TILTED WINDOW SILLS AT FIRST LEVEL.OWNER TO IMMED ENGAGE LIC PE TO INSPECT ENTIRE BLDG.OBTAIN PERMITS FOR RPRS START WRK W/PERMIT NO LATER THAN OCTOBER 01, 2015 |
| Sep 4, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CAR INTO BUILDING |
| Apr 2, 2014 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | WORK WITHOUT A PERMIT; WORK NOTED IN APT'S 18 & 9 GAS WORK WAS COMPLETED. APT 18 HAD PIPING DISCONNECTED & CAPPED OFF APT 9 HAD NEW GAS LINE RAN FROM GAS METER TO COOKING STOVE REMEDY: OBTAIN A PERMIT |
| Feb 10, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 22, 1989 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |