150 Bay 22 Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

20 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Feb 11, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.MLTIPLE DWELLING IN A STATE OF DISREPAIR THE 2ND FL FRAMNG IS EXCESSIVELY SAGGNG@APT1L &2L/A SECTION APPRX 6'LONG.WATER DMG OBSRVD@3RDFL.IMMED INSTLL TEMP SHORNG@AFFECTD AREA UNDR DIRCT& CONTINUOUS SPRVSN OF PE.RPAIR ROOF TO PRVENT WATER DMG.FILE FOR PRMT
Feb 11, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.MULTIPLE DWELLING IN STATE OF DISREPAIR TEMPORARY SHORNG INSTALLED@SOUTHWALL,NORTH WALL&CELLAR,SEVERE SLOPPNG OF FLOORS, FRNT WALL BLDG,WATER DAMAGE.OWNR TO ENGAGE NYSPE&CNTRCTR TO EVAL ENT BLDG&OBTAIN PERMITS TO MAKE BLDG CODE COMPLIANT.FILE FOR PRMT BY3/1/25
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Nov 15, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT APPROXIMATELY 50 LINEAR FEET OF CONSTRUCTION FENCE AT EXP. 1 & 3 TO EXTEND OUT TO THE END OF THE PROPERTY LINE AT EXP. 3 AND TO THE CURB LINE AT EXP. 1 WITH A BOX OUT FOR THE FIRE HYDRANT AND APPROXIMATELY 95 FT OF CONSTRUCTION FENCE AT EXP 2 & 4 TO EXTEND OUT TO THE ADJACENT PROPERTY LOT LINES, TO PROTECT THE PUBLIC & PROPERTY
Nov 13, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL TEMPORARY SHORING FROM CELLAR TO ROOF ALONG EXPOSURE 2 AND EXPOSURE 4 WALLS
Oct 5, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER FRONT EXPOSURE (1) BULGING AT THE 1ST FLOOR LEVEL WITH EVIDENCE OF SEPARATION BULGIND AT EXPOSURE 4 DEFECTIVE REAR WALL AND TRIM BOARDS AT REAR EXTENSION
Jan 5, 2022 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 24, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 25, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #357255 ISSUED ON 9/14/21 FOR OWNER TO REPAIR BUILDING UNDER PERMIT(OBTAIN PERMIT AND START WORK BY 10/18/21) AS OF 10/25/21 NO WORK HAS COMMENCED OR ANY JOBS FILED WITH THE DEPARTMENT. REMEDY: IMMED COMPLY WITH COMMISSIONER'S ORDER #357255
Oct 5, 2021 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL TEMPORARY SHORING AT THE CELLAR TO SUPPORT THE FIRST FLOOR FRAMING AND TIMBER GIRDER
Oct 5, 2021 V-DOB VIOLATION - ACTIVE EGNCY-EMERGENCY NONE FULLY DEMOLISH THE GARAGE
Sep 30, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #357254 ISSUED ON 09/14/21 TO IMMED INSTALL TEMP SHORING AT CELLAR AND START WORK BY 9/17/21 AND FILE FOR PERMIT BY 9/21/21. AS OF 09/30/21 SHORING HAS NOT BEEN INSTALLED AND THERE IS NO FILING STARTED W/THE DEPARTMENT REMEDY: IMMED COMPLY WITH COMMISSIONER'S ORDER #357259
Sep 14, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:MULTI DWELLG STATE DISREPR.SAGGING FLRS@ 1,2& 3RD, ROTTED WOOD JOIST+BEAM AT 1ST FLR,INADEQ SHORING @CELLAR.RACKED DOORS AND WINDWS,BOWING FRONT+NORTH WALLS.WATER DAMAGE IN INTERIOR FINISHES OWNR TO ENGAGE NYS PE TO EVAL ENTIRE BLDG+PROV REPT BY 9/24/21.ENGAGE LIC PE+CONTR RPR BLDG UNDR PERMT.FILE PRMT BY 10/1/21.STRT BY 10/18/21
Sep 14, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:MULTI DWELLG STATE DISREPR.ROTTED JOIST+WOOD BEAM NOTED@1ST FLR.SEVRE SAGGING OF FL FRMG@1,2&3RD FLRS.RACKED DOOR FRAMES@ALL FLRS INADEQ+UNENGINEERED SHORG@CELLAR.FRNT+NORTH WALLS BOWING.OWNR TO IMMED ENGAGE NYS LIC PE TO INSTL TMP SHORNG@CELR-1FLR.SHORNG DESGN BY+INSTLD UNDR DIRCT+CONTIN SUPV PE.WRK STRT NLT 9/17/21.FILE PERMIT BY 9/21/21
Aug 24, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MAIN STAIRS SEVERELY SAGGING AT ALL LEVELS ALONG WITH LANDING SAGGING CRACKING. DOORWAYS TO APARTMENTS SEVERELY OUT OF PLUMB, WATER DAMAGE, OPEN CEILINGS. TEMPORARY SCREW JACKS CEMENTED IN PLACE, FLOOR JOIST ROTTED AT CELLAR.
Aug 24, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED ROOF STRUCTURE FOR A 1 STORY GARAGE HAS COLLAPSED INTO STRUCTURE.
Jan 20, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM.COND 3 STORY WOOD FRAMED.SIDEWALK SHED AT SOUTH&EAST FACES ONE CORNER OF WOOD FRAMED,HIP ROOF IS STRL COMPROMISED.RAFTER IS SPLIT AT MID SPAN&APPROX 2-3 WOOD ROOF JOISTS HAD BECOME DETACHED FROM SUPPORT REMEDY:OWNER IMMED ENGAGE LICPE EVAL BLDG&PREP REPAIR DWGS.DWGS TO BE FILED W/DOB NO LATER 2/10/17.WORK UND PERM BEGIN NO LATER 2/13/17
Jan 3, 2008 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 6, 2006 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED