Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| May 2, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: SECTION OF INTERIOR WEST WALL HAS BEEN DEMOLISHED AND NEW PARTITION WALL INSTALLED CREATING 2 RMS WITH DROP CEILING. NEW WOOD FLOOR OVER EXISTING FLOOR. NEW ELECTRICAL WORK BEING DONE."STOP ALL WORK" IN APT #3 2ND FL. REMEDY: OBTAIN ALL PERMITS IF FEASIBLE CONTACT DOB AT 802-3685 PRIOR TO RETURN TO WORK |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |