Brooklyn Midwood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 18, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD 8FT VERT STEP CRACKS ON BOTH SIDES OF SHARED PARTY WALL W/MORE THAN 1/2 INCH SEPARATION BTWN CMU BLOCKS AT TIME OF INSP, ALSO ON EXP1 SAGGING OF ROOF OVER GARAGE DOOR OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DWGS, REPAIR UNDER PERMIT, START WORK BY 10/18/2026 |
| Aug 18, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD VERT STEP CRACK ALONG EXP3 CORNER W/UP TO 1/2 INCH OF SEPARATION BTWN CMU BLOCK WALL FOR THE REAR WALL OF GARAGE,LENGTH IS ABOUT 8FT LONG FROM BOTTOM TO TOP OF WALL. OWNER TO RETAIN NYSPE TO EVAL THE ENTIRE GARAGE STRUCT,PEPARE/ FILE REPAIR DWGS,REPAIR STRUCT UNDER PERMIT,STAT WORK BY 10/18/2026 |
| Aug 18, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN CODE COMPLIANT MANNER-OBSVD VERT STEP CRACK ALONG EXP3 REAR WALL W/ABOUT 1/4 INCH SEPARATION BTWN CMU BLOCK WALL.LENGTH IS ABOUT 8FT LONG FRIM TOP TO BOTTOM OF REAR SIDE WALL. OWNER TO RETAIN NYSPE TO EVAL ENTIRE GARAGE STRUCT, PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START WORK BY 10/18/26 |