Brooklyn Flatlands
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE BACK OF THE BUILDING CONSTRUCTION DEBRIS PILED UP APPROXIMATELY 20 CUBIC YARDS CONTAINING WOOD FURRING, SHEET ROCKS, BLACK GARBAGE BAGS, ROOFING MATERIAL. |
| Nov 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | NEW PLUMBING WORK WAS DONE THROUGHOUT THE BUILDING, CELLAR, 1ST AND 2ND FLOOR. NEW PLUMBING PIPING INSTALLED HOT AND COLD-WATER LINES. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION. |
| Nov 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED GUT RENOVATION THROUGHOUT THE BUILDING, CELLAR, 1ST AND 2ND FLOOR WITH NEW ELECTRICAL WORK. ELECTRICAL SWITCHES, OUTLETS INSTALLED ALONG WITH ELECTRICAL FIXTURES. NEW AIR CONDITIONERS INSTALLED ALONG WITH CONDENSERS AND ELECTRICAL WIRING. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION. |