Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
22 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 7, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.AS A RESULT OF CNSTRCTN ACTIVITIES@ADJ 1449 55ST,THE 1455 ST BLDG WAS DMGD.EXP2 EXT CORRIDOR CRCKD.EXP2 BEARNG WALL CRCKD.EXP1&3WALLS FOR C LINE APTS.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 10/5/25 & COMPLETE/SIGN OFF BY 12/14/26 |
| Aug 7, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AS A RESULT OF CONSTRUCTION,SUPPORT OF EXCAVATION @ADJ 1449 555ST CONSTRUCTION,THE 1455 BLDG WAS DMGD.EXP2 EXT CORRIDOR CRCKD;EXP2 BEARNG WALL CRCKD/BULGD@1STFL &UP TO PARAPET.OWNR TO IMMED RTAIN NYPE DOB REG GC TO 1.SBMT MEANS&METHDS TO FEU FOR REVIEW/APPRVL, 2.UPN APPRVL IMMED INSTLL TEMP |
| Aug 7, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO CONSTRUCTION ACTIVITY AT 1449 55 STREET. EXCAVATION AND INSTALLATION OF THE SUPPORT OF EXCAVATION (SOE) SYSTEM HAVE CAUSED DAMAGE TO THE ADJACENT BUILDING AT 1455 55 STREET, RESULTING IN STRUCTURAL COMPROMISE ALONG THE ENTIRE C-LINE, INCLUDING THE APARTMENTS AND CELLAR AREA BELOW THE C-LINE. |
| Aug 6, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED LEFT SIDE GROUND LEVEL TEMP SHORING INSTALLED AT EGRESS PASSAGEWAY. AT WALKWAY & FLOORS 1-6 VERTICAL CRACKS CAUSED BY CONSTRUCTION SITE OPERATIONS AT ADJACENT PROPERTY(1449 55 STREET). |
| Jun 20, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 3, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 6, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 26, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 4, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 14, 2015 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 30, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 19, 2011 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 16, 2009 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 20, 2007 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 17, 2006 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 13, 2005 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 5, 2003 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 13, 2001 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 3P2493 |
| Mar 24, 1999 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 3P2493 |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 16, 1991 | VP*-VIOLATION UNSERVED ECB- DISMISSED | E-ELEVATOR ELEVATORREQUIRED | DEVICE #3P2493 |
| Sep 14, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |