Brooklyn Flatbush
145 Kenilworth Place, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 29, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 17, 2020 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 15, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | .DAMAGED OBSERVED TO HAVE BEEN SUSTAINED TO REAR SOUTH SIDE BALCONY OF APT. 5B DUE TO STUCCO COLLPASED FROM APT. 6A REAR BALCONY IN 145KENIL WORTH PLACE BK. A PRTIAL VACATE ORDER ISSUED ON REAR SOUTH SIDE BALCON Y OF APT. 5B |
| May 15, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGED OBSERVED TO HAVE BEEN SUSTAINED TO REAR SOUTH SIDE BALCONY OF APT. 4B DUE TO STUCCO COLLAPSED FROM APT. 6A REAR BALCONY IN 145 KENIL WORTH PLACE BK. A PARTIAL VACATE ORDER ISSUED ON REAR SOUTH SIDE BALCO NY OF APT. 4B |
| May 15, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGED OBSERVED TO HAVE BEEN SUSTAINED TO REAR SOUTH SIDE BALCONY OF APT. 3B DUE TO STUCCO COLLAPSED FROM APT. 6A REAR BALCONY IN 145 KENIL WORTH PLACE BK. A PERTIAL VACATE ORDER ISSUED ON REAR OUTH SIDE BALCON Y OF APT.3B |
| May 15, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO REAR DECK OF APT. 2B DUE TO STUCCO COLLAPSED FROM APT. 6A BALCONY REAR IN 145 KENILWORTH PLACE BK |
| Oct 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 9, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 20, 2012 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 11, 2011 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 15, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH FULL STOP WORK ORDER #11207CEX01RM ON 112007 A STOP WORK ORDER WAS ISSUED ON 3/17/08 A PARTIAL RESCIND WAS ISSUED FOR THE PURPOSE OF INSTALLING LAG BOARDS ONLY ON THAT DATE FOUNDATION WORK HAD NOT COMMENCED UPON INSPECTION ON A 15 08 WORK EXCEEDS PARTIAL LIFT AND FOOTINGS WERE IN PLACE REMEDY: STOP ALL WORK AND MAKE SAFE |
| Nov 20, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED PLANS FOR SHORING SHEET PILING OPERATIONS NOTED: WORK IN PROGRESS UNDER JOB #301030695 EXP 10-08-08 SOLDIER PILE S ERECTED THROUGHOUT SITE HOWEVER NO APPROVED PLANS PROVIDED AT TIME OF INSPECTION APPROX 75% WORK SLOPE COMPLETED OF EXCAVATION REMEDY: STOP ALL WORK EXCEPT TO MAKE SAFE/CALL 718 8024594 |