Brooklyn Flatbush
1447 Flatbush Avenue, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD A FIRE DMG ON 2/13/24.ERT ISSUED A FULL VACATE ORDR ON THE SAME DAY PER ERT PHOTOS,THE BLDG INTERIOR CEILNG,WALL STUDS,&ROOF HAD COMPROMISD IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 337267 (112724FEU31402ZT) TO REPAIR THE BUILDING UNDER PERMIT |
| Nov 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SFFRD A FIRE DMG ON 2/13/24.ERT ISSUED A FULL VACATE ORDR ON THE SAME DAY.PER ERT PHOTOSTHE BLDG INTERIOR CEILNG,WALL STUDS,& ROOF HAD COMPROMSD.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DTRMINE STRCTRL STBILITY,& PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT |
| Aug 15, 2024 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Feb 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING SUSTAINED FIRE AND WATER DAMAGE, WHERE ROOF OPEN TO THE ELEMENTS, DOORS AND WINDOWS OUT, JOIST CHARRED. |
| Feb 13, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. OBSERVED BUILDING SUSTAINED FIRE AND WATER DAMAGE , WHERE WINDOW AND DOORS OUT, EXCESSIVE WATER DAMAGE, ROOF OPEN TO THE ELEMENTS, JOIST CHARRED DUE TO FIRE. VACATE ENTIRE BUILDING. |
| Feb 13, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL UP ALL FIRE DAMAGED OPENINGS TO PROTECT AGAINST UNLAWFUL ENTRY AN D TO SAFEGUARD THE PUBLIC AND PROPERTY |