Brooklyn Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 1, 2009 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 11, 2006 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT CELLAR LEVEL (EAST-REAR) APPROXIMATE 2FT LONG BY 6 INCH HIGH SECTIO N OF FOUNDATION WALL IS CRUMBLED & CHIPPED AWAY AT BOTTOM OF WALL BY F LOOR. THE CONCRETE FLOOR IN SAME AREA HAS A 2-3 FT CRACK LINE AND IS B UILDING UPWARD. REMEDY: MAINTAIN FIX REPAIR DEFECTS AT CELLAR LEVEL |
| Mar 26, 2002 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |