Brooklyn Downtown Brooklyn-DUMBO-Boerum Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 13, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. ATOI, OBSERVED ROOF OF A 6 STORY BUILDING HAS BEEN ILLEGALLY ALTERED. NOTED ROOF VERTICALLY/HORIZONTALLY ENLARGED, & FULLY ENCLOSED, CREATING 7TH FLOOR. NOTED VERTICAL CRACKS RUNNING FROM 3RD FLR. TO THE ROOF AT EXP2 & EXP4. CREATING AN IMMEDIATE UNSAFE HAZARD FOR OCCUPANTS, NEARBY PUBLIC AND PROPERTY. NO PERMITS ON FILE. |
| Feb 13, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROX. 35'FT LINEAR FEET OF OVERHAED PROTECTION SIDEWALK SHED AT EXPOSURE 1 SPANNING ENTIRE FRONT OF THE BUILDING, THIS INCLUDES THE ADDITIONAL 5'FT ON BOTH LEFT AND RIGHT SIDES TOWARDS ADJACENT PROPERTIES |
| Jun 4, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 3, 2020 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE APPROVALS AND PERMITS UNDER APPLICATION # 340623052 ON ALL SPRINKLER WORK DUE TO FIRE SUPPRESSION CONTRACTOR LICENSE REVOKED. FSC# 772. STOP ALL PLUMBING WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE. |
| Feb 5, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 24, 2005 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |