Brooklyn Bushwick (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 31, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL FIRE DAMAGED OPENINGS TO SAFEGUARD THE PROPERTY |
| Dec 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ENGINEERS REPORT REQUIRED. OBSERVED AT 3RD-STY LEVEL, CHARRING TO STRUCTURAL MEMBERS, WINDOWS AND DOORS OUT ,CEILING AND WALLS DAMAGED ,WATER DAMAGE THROUGHOUT, ROOF OPEN TO THE ELEMENTS DUE TO FIRE. |
| Dec 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED AT 3RD-STY LEVEL, CHARRING TO STRUCTURAL MEMBERS, WINDOWS AND DOORS OUT ,CEILING AND WALLS DAMAGED ,WATER DAMAGE THROUGHOUT, ROOF OPEN TO THE ELEMENTS DUE TO FIRE. |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 5, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 5, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 5, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |