NYC Building Report

Brooklyn Bushwick (East)

1367 Decatur Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-03431-0066), so they can include other buildings on the same lot.

8 records

Date Class Status Apartment Summary
Nov 16, 2012 C VIOLATION CLOSED Not available SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AT PUBLIC HALL, 2nd STORY
Nov 16, 2012 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
Nov 16, 2012 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY
Nov 16, 2012 B NOV SENT OUT 2 SECTION 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES EXPOSED ELECTRIC WIRES AT CEILING AND NORTH WALL. IN THE KITCHEN LOCATED AT APT 2, 2nd STORY
Nov 16, 2012 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
Oct 3, 2012 A NOV SENT OUT Not available SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING AT PUBLIC HALL, 2nd STORY
Oct 3, 2012 B NOV SENT OUT Not available SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 2nd STORY
Oct 3, 2012 C NOV SENT OUT Not available SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE : WALLS AND CEILING WITH FIRE RETARDED MATERIAL AT PUBLIC HALL, 2nd STORY