Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 27, 2010 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 10, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FAILURE TO ADEQUATELY PROTECT THE SIDES OF AN EXCAVATION CARRIED TO A DEPTH GREATER THAN 5 FEET NOTED: AT TIME OF INSPECTION AN EXCAVATION SITE FOUNDATION WALL PARTIAL AT REAR YARD SHEER CUT APPROX 7' TO 8' DEEP AT REAR SIDE AND YARDS AND NO SHEETING AND SHORIN G PROVIDED REMEDY: STOP ALL WORK MAKE SAFE IMMEDIATELY PROVIDE PROTECT |
| Jan 10, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FAILURE TO ADEQUATELY PROTECT THE SIDES OF AN EXCAVATION CARRIED TO A DEPTH GREATER THAN 5 FEET NOTED: AT TIME OF INSPECTION AN EXCAVATION SITE FOUNDATION WALL PARTIAL AT REAR YARD SHEET CUT APPROX 7' TO 8' DEEP AT REAR SIDE YARDS AND NOT SHEETING AND SHORING PROVIDED REMEDY: STOP ALL WORK MAKE SAFE PROVIDE PROTECTION BACKFILL |