Brooklyn Fort Greene
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
26 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.EXP4 LOAD BEARNG WALL APPRX 20LINEAR FT WAS BULGNG OUT ALNG 2NDFL LVL@EXISTNG CHIMNEY FLUTE&EXTENDED ON EACH SIDE PER 20FT LENGTH ALNG EXPOSD WALL VERT CRCKS@CHIMNEY FLUTE BTWN IMMEDIATELY COMPLY COMMISSIONER'S ORDER 350229 (110125FEU30201PN)DATED 12/1/2025 |
| Dec 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.EXP4 LOAD BEARNG WALL APPRX 20LINEAR FEET WAS BULGD OUT ALNG 2NDFL LVL@EXISTNG CHIMNEY FLUTE&EXTENDED ON EACH SIDE PER 20FT LENGTH ALNG EXPOSD WALL.VERT CRCKS@CHIMNEY FLUTE.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG & FIE DWGS W/DOB.PERM RPAIR BLDG UNDR STRTNG BY 2/9/26&CMPLTD/SGN OFF BY 3/31/26 |
| Dec 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.EXP4 LOAD BEARNG WALL APPRX 20LINEAR FT WAS BULNG OUT ALNG 2NDFLL LVL@EXISTNG CHINEY FLUTE&EXTNDED ON EACH SIDE PER 20FT LENGTH ALNG EXPOSD WALL VERT CRCKS@CHIMNEY FLUTE BTWN IMMEDIATELY COMPLY COMMISSIONER ORDER 350229 (110125FEU30201PN) DATED 12/1/2025 |
| Dec 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEERING REPORT DUE TO A SECTION OF THE FA ADE AT EXPOSURE 4 THAT COULD POTENTIALLY COLLAPSE ONTO THE ADJACENT PROPERTY. AN ENGINEERING ASSESSMENT IS REQUIRED TO EVALUATE THE CONDITION AND DETERMINE THE NECESSARY REPAIRS TO ADDRESS THE DAMAGE SUSTAINED. |
| May 4, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 45-LINEAR FEET SIDEWALK SHED AT EXPOSURE # 01 COVERING MAIN ENTRANCE DOOR AND ERECT APPROXIMATELY 35-LINEAR FEET SIDEWALK AT EXP#4 TO SAFEGUARD THE PUBLIC AND PROPERTY |
| May 3, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ROOF, CORNICE AND APT # 10 AT 4TH FLOOR LEVEL DUE TO FIRE AT 55 CUMBERLAND STREET BK. VACATE APT # 10. |
| Aug 4, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Aug 4, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Apr 6, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 6, 2011 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | COMMISSIONERS ORDER FOR CORRECTION MEASURES: DEFECT NOTED AT EXPOSURE #2 VERTICAL STEP CRACKS BETWEEN 2ND AND 3RD FLR., BRICK WALL BULDGING AT 2ND & 3RD STORY REMEDY; PROVIDE D.O.B. WITH ENGINEER'S REPORT ENSURING STRUCTURAL STABILITY, MAKE REPAIRS AS REQUIRED |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |