Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 3, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL A SIDEWALK SHED/OVERHEAD PROTECTION APPROXIMATELY 20 LINEAR FT AT EXPOSURE 1 WITH AN APPROX HEIGHT OF '16 TO SAFEGUARD THE PUBLIC |
| Jul 2, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE PREMISE IS A DAYCARE LANGUAGE SCHOOL. THE FRONT FACADE MASONRY IS DEFECTIVE,CRACKED, AND BULGING. THE LIMESTONE LINTEL AT THE 2ND FLOOR WINDOW ABOVE THE MAIN ENTRANCE IS CRACKED AND HAS SPALLED. THE DEFECTIVE LINTEL IS IN DANGER OF FALLING AT TIME OF INSPECTION. THE REMAINING LINTELS ARE SUSPECT. |