Brooklyn Mapleton-Midwood (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION, OBSERVED 3 STORY BUILDING, 2 STACKED BALCONIES EXPOSURE 1, 1ST & 2ND FLOOR, VERTICALLY SHORED WITH SCREW JACKS AND 2 X 6 X 8 WOOD PLANKS, ALSO OBSERVED SEPARATION FROM THE BRICK AND STEEL SPANDREL BEAM ALONG THE SIDES 1ST FLOOR, ALSO VISIBLE CRACKS, BRICK AND MORTAR JOINTS. |