DOB violations
Department of Buildings violations attached to this BIN or tax lot.
20 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 27, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT APARTMENT 2R AND 3R FIRE DAMAGE, AT 2R WINDOWS AT 2ND FLOOR FIRE ESCAPE AND SKYLIGHT ARE BOARDED UP NO SECOND MEANS OF EGRESS, APT 3R IN KITCHEN BACK WALL OPEN AND CEILING INADEQUATE FIRE RATING OBSERVED. |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Jan 3, 2008 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Nov 8, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT: WORK NOTED: AT CELLAR LEVEL ON CENTER WALL EXIST 2 CAPPED GAS LINES 1 HOT WATER FEED 1 COLD WATER FEED AND A COUNTER (BREAKFASTNOOK) REMEDY:. OBTAIN PERMITS REMOVE GAS LINE AND SUPPLY LINES BACK TO SOURCE |
| Jun 13, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PARTITIONS REMOVED, BX CABLES REMOV ED IN APT. 1L AND 1R. ALSO FLOOR JOIST CUT IN MIDDLE ROOM OF 1L TO CRE ATE INTERIOR STAIRS TO CELLAR. PLASTER REMOVED IN REAR WALL WHERE KITC HEN WAS. GAS LINE REMOVED. ALL KITCHEN AND BATH FIXTURES REMOVED. NEW DOOR OPEING CREATED TO ALLOW ACCESS TO REAR YARD WITH APT. 1R |
| Jun 13, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 13, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: FULL 3 PC. BATHROOM AND KITCHEN CRE ATED IN CELLAR. PARTITIONS ERECTED TO CREATE SEPERATE ROOMS. OPENING I N CEILING TO ALLOW ACCESS TO APT. 1L. HUNG CEILING ALSO INSTALLED IN C ELLAR. WORK LISTED IS OLD AND NOT BEING DONE AT THIS DATE REMEDY: OBTAIN PERMITS OR RETURN PREMISES TO PRIOR LEGAL CONDITION |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |