Brooklyn Kensington
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 31, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROX. 78 LINEAR FEET OF OVERHEAD PROTECTION SIDEWALK SHED SPANNING ENTIRE EXPOSURE 4 OF THE BUILDING UP TO THE CURB CORNER OF EAST 2 STREET AND CHURCH AVE.THIS INCLUDED ADDITIONAL MINIMUM 5"FT ON BOTH SIDES |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 20, 1993 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 20, 1993 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 7, 1990 | VP*-VIOLATION UNSERVED ECB- DISMISSED | B-BOILER BOILER OPTIONAL | 42C/4B STEAM GAUGE DEFECTIVE |