Brooklyn Bedford-Stuyvesant (East)
126 Malcolm X Boulevard, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 26, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 28, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 7, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONERS ORDER.COMMISSIONERS ORDER CONTROL# 328042 REQUIRED DWGS TO BE FILED BY 7/25/16&WORK TO COMMENCE UNDER PERMIT BY 8/8/16.AS OF 8/10/16 NO PERMIT HAS BEEN FILED.REMEDY:COMPLY W/COMMISSIONERS ORDER#328042 W/PERMIT FILED&WORK COMMENCING BY 8/19/16 |
| Jul 28, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONERS ORDER.COMMISSIONERS ORDER CONTROL# 328043 REQ THE REMOVAL&RELOCATION OF THE UNPERMITTED TIGHT BOARD FENCE WITHIN THE PROPERTY LINE&A FULL LENGTH EXP.2 SIDEWALK SHED W/CONTINUOS PROTECTION BET THE TWO.REMEDY:COMPLY W/COMMISSIONERS ORDER.FAILURE TO COMPLY WILL RESULT IN HPD AUTH TO COMMENCE WORK ON YOUR BEHALF |
| Jul 27, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 8, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM.THE BLDG IS WOOD FRAMED W/BRICK MASONRY BEARING WALLS.THE EXPOSURE 2(SOUTH)FACADE HAS NOT BEEN MAINTAINED&HAS SIGNIFICANTLY DETERIORATED THE FACADE IS LIKELY TO BECOME UNSTABLE SOON UNLESS REPAIRS ARE DONE REMEDY:BY 7/25/16 OBTAIN PERMITS&COMMENCE WORK TO REMOVE EXISTING FENCE&INSTALL A TIGHTBOARD FENCE ALONG FULL LENGTH OF BLDG ATSOUTHSIDE |
| Jul 8, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM.THE BLDG IS WOOD FRAMED W/BRICK MASONRY BEARING WALLS.THE EXPOSURE 2(SOUTH)FACADE HAS NOT BEEN MAINTAINED&HAS SIGNIFICANTLY DETERIORATED THE WALL IS SEPARATED FROM THE BACKUP STRUCTURE&IS BULGING OUT OF PLANE.REMEDY:FILE DWGS TO STABILIZE&REPAIR THE EXPOSURE 2 MASONRY WALL BY 7/25/16.WORK TO COMMENCE UNDER PERMIT BY 8/8/16 |