Brooklyn East Flatbush-Rugby
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04622-0029), so they can include other buildings on the same lot.
630 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Apr 11, 2024 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL AT PUBLIC HALL, 1st STORY |
| Apr 11, 2024 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT EAST WALL AT PUBLIC HALL, 1st STORY |
| Apr 9, 2024 | A | VIOLATION DISMISSED | Not available | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Mar 17, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE AT DOOR TO BULK-HEAD AT PUBLIC HALL STAIRS, 4th STORY, SECTION AT NORTH |
| Mar 17, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE TREAD FIRST FROM TOP AT LANDING TO BULKHEAD AT PUBLIC HALL STAIRS, 4th STORY, SECTION AT NORTH |
| Mar 4, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR SADDLE IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Mar 4, 2024 | C | VIOLATION DISMISSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LEADING TO CENTER COURT, NORTH SECTION. HINGES DEFECTIVE. AT PUBLIC HALL, 1st STORY |
| Mar 4, 2024 | C | VIOLATION DISMISSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LEADING TO CENTER COURT, SOUTH SECTION, HINGES DEFECTIVE AT PUBLIC HALL, 1st STORY |
| Feb 18, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT BUILDING ENTRANCE DOOR |
| Feb 18, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT LOWER WINDOW SASH AT PUBLIC HALL STAIRS, 1st STORY, SECTION ''SOUTH'' |
| Feb 18, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE MISSING LATCH AT DOOR LEADING TO INNER COURT AT PUBLIC HALL, 1st STORY, SECTION ''SOUTH'' |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | C | VIOLATION DISMISSED | D9 | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT D9, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER SASH WINDOW 1ST FROM SOUTH AT PUBLIC HALL, 1st STORY |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | C | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | A | VIOLATION DISMISSED | D9 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ AT WINDOW FRAME IN THE BATHROOM LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 18, 2024 | B | VIOLATION DISMISSED | D9 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE KITCHEN LOCATED AT APT D9, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Feb 9, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | DEFECT LETTER ISSUED | C3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | DEFECT LETTER ISSUED | C3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | DEFECT LETTER ISSUED | C3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | DEFECT LETTER ISSUED | C3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | DEFECT LETTER ISSUED | C3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | VIOLATION CLOSED | Not available | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE ON DOOR AT BUILDING ENTRANCE |
| Feb 9, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HINGES ON CLOSET DOOR AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SADDLE AT DOOR FRAME IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HINGES ON DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | VIOLATION CLOSED | C3 | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING COUNTER BALANCE AT UPPER SASH WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | VIOLATION CLOSED | C3 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | VIOLATION CLOSED | C3 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | C | NOT COMPLIED WITH | C3 | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR, BASEBOARD AT NORTH WALL, 2nd CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM WEST AT NORTH WALL DOOR FRAME, BASEBOARD AT SOUTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 9, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Feb 7, 2024 | B | VIOLATION DISMISSED | D10 | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER SASH WINDOW A SOUTH 2 ROOM SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT D10, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | A | VIOLATION DISMISSED | C3 | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE KITCHEN LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 HMC: REFIT CLOSET DOOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Jan 28, 2024 | B | VIOLATION DISMISSED | C3 | § 27-2005 HMC: REFIT DOOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 27, 2023 | A | VIOLATION DISMISSED | C10 | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER AT NORTH IN THE BATHROOM LOCATED AT APT C10, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |