Brooklyn Fort Greene
125 Fort Greene Place, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 9, 2022 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | PARTIAL DEMOLITION. DEMOLISH THE ENTIRETY OF THE TWO-STORY EXTENSION AT THE REAR OF THE BUILDING. SEAL ALL RESULTING OPENINGS |
| Feb 8, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN BLDG IN SAFE COND.BRICK FACADE @EXP1 CRACKD&DEFORMD/ OUT OF PLANE.EVIDENCE OF SETTLMNT @ CORNR EXP1/2.LINTEL/SILLS&SPANDRL AREAS SLOPD DOWN TWRDS EXP2 W/SIMLR CRACKS ON INTERIOR FINISH.OWNR RETN NYSPE-INSTLL& MAINTAIN CRACK MONITRS@VARIUS CRACKS EXP1 FACAD/MONTLY MIN.IF +- 2MM MVMNT NOTIFY DOB.IMPLT 2/21 |
| Jan 20, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 4, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR SHED @EXP1 AS FOLLOWS:A) LOWER SHED TO PALTFORM TO AN ELEVATION JUST BELOW LINTELS OVER 1FLOOR OPENINGS.SHED PLATFORM SHOULD EXTEND U/DAMAGED LINTELS SO AS TO CATCH ANY MATERIAL THAT MAY FALL. B) EXTEND SHED PLATFORM OVER AND BEYOND EXP#4 PROPERTY LINE THE REQUISITE 5 FEET |
| Oct 25, 2019 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Oct 24, 2019 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Oct 21, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROX. 31 LINEAR FEET OF SIDEWALK SHED TO COVER THE ENTIRE WIDTH OF THE FRONT YARD & FIVE FEET OF EACH ADJOING LOT,EXTEND APPROX 20 LINEAR FT IN DEPTH TO COVER THE YARD/STOOP & PUBLIC SIDEWALK TO SAFEGUARD PUBLIC AND PROPERTY AT EXP#1 |
| Oct 18, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:FACE BRICK@EXP1 CRACK&DELAMIN FROM BLDG&AT RISK OF FALLING INTO FRNT YARD&ADJ PUB ROW.EVIDENCE OF SETTLEMENT OF EXP2 PARTY WALL REAR EXT W/ROTTED FLR JOIST,DMG EXT FINISHES@RISK OF FALLING INTO REAR YARD OWNR RETAIN PE TO EVALUATE ENTIRE BLDG&DEVELOP COMPREHENSIVE REPAIR FOUNDATION PLAN.PERFORM NECESSARY WORK UNDER PERMIT.FILE BY 12/1/19 |
| Dec 30, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 2, 2015 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Nov 4, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |