Brooklyn Park Slope
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01067-0001), so they can include other buildings on the same lot.
12 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Sep 26, 2023 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | FL 4 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 5 SQ FT AT 1ST WINDOW RECESS FROM SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16252194 ISSUED 26-SEP-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Sep 26, 2023 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR NORTH WALL AND CEILING AT PUBLIC HALL, 3rd STORY |
| Sep 26, 2023 | B | NOV SENT OUT | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR NORTH WALL AT PUBLIC HALL, 4th STORY |
| Sep 26, 2023 | A | NOV SENT OUT | Not available | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY |
| Sep 26, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 4th STORY |
| Sep 26, 2023 | B | NOV SENT OUT | FL 4 | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | B | NOV SENT OUT | FL 4 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | FL 4 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FT AT 2ND WINDOW RECESS FROM NORTH IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | B | NOV SENT OUT | FL 4 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | FL 4 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FT AT 1ST WINDOW RECESS FROM SOUTH IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | FL 4 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FT AT CEILING AND 15 SQ FT AT SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Sep 26, 2023 | A | VIOLATION CLOSED | FL 4 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 5 SQ FT AT 1ST WINDOW RECESS FROM SOUTH IN THE 1st ROOM FROM EAST LOCATED AT APT FL 4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |