Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 9, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT -NOTED -3 WINDOWS INSTALLED ON SOUTH SIDE OF PREMISES ONE WINDOW ON EACH OF THREE FLOORS.HOLES WERE MADE FROM FIRST TO THIRD FLOORS.FIRST ,THEN NEW WINDI=OWS INSTALLED REMEDY:GET PERMITS FOR WORK DONE OR RESTORE TO PRIOR LEGAL CONDITION |
| Jun 29, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: OPENING MADE IN SOUTH WALL AT 1ST FLOOR, 2ND FLOOR & 3RD FLOOR LEVELS AND WINDOWS INSTALLED AT SOUTH SIDE LOT LINE REMEDY: OBTAIN PERMITS AND APPROVALS FROM DOB IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |
| Jun 29, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: INTERIOR PARTITIONS BEING ERECTED ON SECOND FLOOR. STOP ALL WORK REMEDY: STOP ALL WORK, OBTAIN PERMITS AND APPROVALS FROM DOB. CONTACT DOB OFFICE BEFORE RETURNING TO WORK AT 718-802-3685 |
| Sep 17, 1998 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: (3) WINDOWS INSTALLED ON SOUTH SIDE OF PREMISES. (1) WINDOW AT EACH OF (3) FLOORS. HOLES WERE MADE IN MASONRY STRUCTURE TO INSTALL WINDOWS. ALSO PARTITIONS ERECTED IN PUBLIC HALLWAY ON FIRST & THIRD FLOORS. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |