NYC Building Report

Brooklyn Williamsburg

123 Hope Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

15 records

Date Status Type Summary
Mar 2, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 2, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 28, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 31, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 5, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 13, 2018 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE PTAC UNITS THROUGHOUT THE BUILDING INSTALLED WITH FLEXIBLE CONNECTORS WHICH IS PROHIBITED. STOP ALL WORK UNDER #320625436 EXCEPT TO REMOVE FLEXIBLE CONNECTORS ON PTAC UNITS
Jun 4, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 4, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 4, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 4, 2018 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 4, 2018 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 9, 2017 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK AFTER HOURS WITHOUT VARIANCE PERMIT
Sep 24, 2015 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL 1 STORY INDUSTRIAL BLDG W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE A NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION CALCULATIONS PROBES ETC AND SUBMIT REPORT ACCEPTABLE BY DEPT RPR DRWGS T/BE FILE WITH DOB W/IN 45 DAYS AFTER THE INSPECTION
Jul 31, 2014 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. THE BLDG HAS A WOOD BOW- STRING TRUSS ROOF. THE DEPARTMENT SERVED YOU A CURABLE COMM. ORDER (NOTICE OF VIOLATION) ON 5/09/2014 TO PRODUCE AN ENGR REPORT ON YOUR BLDG. NO ENGR REPORT HAS BEEN RECEIVED. COMPLY PER THE COMMISIONER'S ORDER
May 9, 2014 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL 432 RODNEY ST:1STRY,OCCUPD FACTORY BLDG/WOOD BOWSTRING TRUSS ROOF.W/IN 60 DAYS OF VIO OWNER TO ENGAGE NYS LIC PE EXPERIENCED W/WOOD TRUSSES TO PROBE&EVALUATE STRUCTR'L SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS,CALCULATIONS,PROBES,ETC. EA.TRUSS&BEARINGS EVAL'D. ANY STRUCTURAL DEFICIENCIES SHORED.REPAIR DRWGS.FILED WITHIN 45 DAYSOF VIO