Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 3, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1.AT FRONT EXP#1,PROVIDE APPROX.30LINEAR FT OF CONSTRUCTIONFENCE ALONG SWS AT EAST OF BLDG.CONSTRUCTION FENCE SHALL BE INSTALLED WITH 2 FIVE FOOT RETURN BACK TO BDLG TO ENCLOSE THE AREA IN FRNT OF GARAGEBAY WITH DEFECTIVE BRICK.2.SEAL ALL ACCESIBLE TO PREVENT UNAUTHORIZED ACCESS |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION |