Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD A FIRE DMG ON 3/21/24.ERT ISSUED A FULL VACATE ORDER ON THE SAME DAY PER ERT PHOTOS,THE BLDG INTERIOR CEILNG&STUD WALLS WERE COMPROMSED.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 337266 (112724FEU31201ZT) TO REPAIR BUILDING UNDER PERMIT |
| Nov 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD A FIRE DMG ON 3/21/24.ERT ISSUED A FULL VACATE ORDER ON THE SAME DAY PER ERT PHOTOS, THE BLDG INTERIOR CEILNGS&STUD WALLS WERE COMPROMISED.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DTRMINE STRCTRL STBILITY& PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT |
| Mar 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN 3STORY SEMI-ATTACHD RESIDENTIAL BLDG THAT SUSTAIND FIRE DAMAGE ON 3/21/24.SEVERE WATER DAMAGE&CLLPSD CEILINGS@ALL FLOORS MISSING WNDWS@REAR.SOME ROOF JOISTS SEVERELY BURNED.OWNR TO ENGAGE NYSPE&CNTRCTR TO EVAL REPAIR BLDG UNDR PRMT FILE FOR PRMT 5/1/24 COMPLEYE BY 7/1/24 |
| Mar 21, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISE NON-COMPLIANT: DUE TO A FIRE AND FIRE FIGHTING OPERATIONS CAUSING DAMAGE TO THE ROOF MEMBERS,WALLS,CEILINGS,WINDOWS,DOORS AT ALL ELEVATIONS RENDERING THE PREMISE NON-COMPLIANT |