1225 43 Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Aug 28, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL COMPLY WITH STOP WORK ORDER
Aug 2, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK. MISCELLANEOUS VIOLATION FAILURE TO COMPLY WITH AN ORDER TO STOP WORK BY DEPARTMENT. NOTED! AT TIME OF INSPECTION JOBSITE WITH WITH A PARTIAL SWO TO DO UNDERPINNING AND SHEETING AND SHORING FOUNDATION WALLS IN PLACE AT EXP 3 AND PARTIALLY AT EXP 2AND 4 CONTRARY TO PARTIAL LIFT JOB # 302344899. STOP ALL WORK COMPLY WITH
Feb 20, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISSIONER HAS ISSUED A 10 DAY LETTER OF INTENT TO REVOKE AP PLICATION #301344899 ON 2/12/08 APPROX. 5% OF WORK COMPLETED REMEDY:STOP ALL WORK IMMEDIATELY MAKE SAFE. CALL DOB PRIOR TO RETURN T TO WORK. PROVIDE REQUIRED IMFORMATION FORTHWITH
Jan 10, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL NO APPROVED PLANS NOTED: APPROVED SET OF PLANS IS MISSING PLAN ELEVATI ONS AND DETAILS IS INCOMPLETE JOB#302344899 REMEDY: STOP ALL WORK PROVIDE PLAN CALL SEP EXCAVATION 718 802-4594
Dec 19, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH SWO#112907CEX01LP FOR JOB#302344899 NOTED CONTINUOUS WORK IN THAT AT NORTH PERIMETER FOOTING CONCRETE IS POURED AND FORM WORK FOR FOUNDATION IN PLACE SHEAR CUT 9FT DEPTH AT WEST SECTION APPROX 20% COMPLETED REMEDY: STOP ALL WORK EXCEPT TO BACKFILL CALL 718 802-4594
Nov 29, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE APPROVED PLANS ON SITE DURING UNDERPINNING NOTED: UNDER APP#302344906 ISSUED 11-13-07 THE UNDERPINNING DETAIL ON DRAWING S-2 IS NOT DETAILED TO CONDUCT INSPECTION NO MENTION OF BOX PITS DEPTH OF UNDERPINNING REMEDY: STOP ALL WORK BACKFILL UNDERPINNING FORTHWITH CALL 718 8024594