Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 2, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISES 3-STORY ATTACHED, NFP DWELLING AND UNDER GROUND STREET WORK IN PROGRESS IN FRONT OF THE BUILDING . OBSERVED A APPROX. 5-0" LENGTH VERTICAL HAIRLINE CRACK IN BASEMENT WALL AND A 3-0" LENGTH HORIZONTAL HAIRLINE CRACK IN BATHROOM FLOOR TILES AT 3RD FLOOR LEVEL. UNABLE TO DETERMINE THE CAUSE OF CRACKS. |