Brooklyn Ocean Hill
1186 Herkimer Street, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 30, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 18, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 24, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONERS ORDER CONTROL#327724 REQUIRES OWNER TO START WORK UNDER PERMIT NO LATER THAN 3/18/16. AS OF 3/24/16 NO PERMIT HAS BEEN OBTAINED ACCORDING TO BIS. REMEDY:IMMED COMPLY WITH COMMISSIONERS ORDER CONTROL#327724 |
| Feb 23, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM.THE 1ST FLR FRAMING BENEATG THE 1ST FLR BATHROOM IS NOT CONSTRUCTED IN A CODE COMPLIANT MANNER.THE WOOD FRAMING IS ECCENTRICALLY SPLICED W /GAPS BTWN CONNECTIONS.SPLICES WERE IN A REGION THAT WAS APPROX 4'X10 SIGNIFICANT DEFLECTION AND MOVEMENT WAS NOTED DURING USE. REMEDY: RETAIN NYS LIC PE TO FILE DWGS FOR PERM. REPAIR BY 3/4/16 |
| Feb 23, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK:THE 1ST FL FRAMING BENEATH THE 1ST FL BATHROOM IS NOT CONSTRUCTED IN A CODE COMPLIANT MANNER THE WOOD FRAMING IS ECCENTRICALLY SPLICED W/GAP BTWN CONNECTIONS. REMEDY:IMMED INSTALL SHORING BTWN THE CELLAR & 1ST FL BATHROOM FRAMING UNDER THE DIRECTION OF A NYS LIC PE AN APPLICATION FOR A PERMIT IS TO BE SUBMITTED |
| Feb 18, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OCCUPANCY DOESN NOT COMPLY WITH HMC, IN THAT THERE IS NOT 80 SQ FT OF LIVABLE SPACE PER PERSON THRU-OUT |