Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 22, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BROOKLYN BOROUGH COMMISSIONER HAS ISSUED STOP WORK ORDER ON ALT1 321522508. APPROVED PLANS INDICATE ADDING A 2 STORY & PENTHOUSE VERICAL EXTENSION TO AN EXISTING 3 STORY BUILDING, THEREFORE THIS BLDG IS BECOMING 5 STORIES AND A PENTHOUSE. THE PLANS WERE APPROVED IN ERROR & CCD1(51293) WAS DENIED 5/15/2017 FOR PROPOSED 66 FOOT BLDG HGT |
| Sep 24, 2016 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jul 17, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 4, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: CONCRETE BLOCK & BRICK WORK AT 1ST FLOOR EXTERIOR WALL, WITH STEEL LINTELS & NEW STEEL DOORS & FRAMES INSTALLED. APPROX SIZE OD BLOCK AND BRICK WORK, 18'X 10'. NOTE: BRICK UNKEYED AT STORE ENTRANCE REMEDY: OBTAIN PERMIT |