Brooklyn Bushwick (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 6, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE CONDITION-PARTY WALLS AT EXP 2 AND 4 APPROX 20FTW X 55FTD EXP3 PARTIALLY DETACHED 7 BULGING OUT AT THE 1FL AND 2FL. EXP3 WALL WAS STRUCTUALLY UNSTABLE AND AT RISK OF COLLAPSE. REMEDY: OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG AND FILE REPAIR DWGS, START WORK UNDER PERMIT BY 10/17/22 AND COMPLETE. SIGNED OFF BY 11/25/2022 |
| Sep 6, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FULL VACATE-PARTY WALLS AT EXP 2 AND 4 APPROX 20FTX X55FTD, EXP3 PARTIALLY DETACHED AND BULGING OUT AT THE 1ST TO 2FL. EXP3 WALL WAS STRUCTURALLY UNSTABLE AND AT RISK OF COLLAPSE. REMEDY: FULLY VACATE PREMISES UNTIL HAZARDOUS CONDITIONS HAVE BEEN REMEDIED UNDER PERMIT |
| Sep 15, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 23, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION AT REAR OF BUILDING 1ST FLOOR HAS LARGE BULGE OUTWARD AND IN DANGER OF COLLAPSE. |