Brooklyn Bushwick (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348407 PLUS-CAP-121025PI30401SB DATED 12/10/2025 REQURING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 01/10/2026. AS OF 01/29/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/THE COMMISSIONER'S ORDER CONTROL#348407 PLUS DOB CAP 121025PI30401SB |
| Dec 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN-OBSVD AT EXP1 PARAPET LEAINING INWARDS WITH A HORIZONTAL MASONRY CRACK ABOVE 2FL WINDOWS. NEAR EXP1/2 OBSVD SEVERAL MASONRY CRACKS NEAR 1FL AT EXP2&3 OBSVD MASONRY CRACKS @ THE PARAPET LEVEL. OWNER TO IMMED RETAIN REG DESING PROF IN GOOD STANDING W/DOB& NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |