| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.THE BLDG SUFFERED FIRE DMG ON/ARND 5/16/25.FRNT OF THE ROOF PRTLLY CLPSD INTO 4THFL DMGNG THE 4TH FL FRAMNG&LEAVNG THE 4THFL EXP1 WALL UNBRACED.ROOF JOISTS.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PERMT STRTNG BY 9/28/26 |
| Aug 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDR.THE BLDG SFFRD FIRE DMG ON/ARND 5/16/26 FRNT OF THE ROOF PRTLLY CLLPSD INTO 4THFL DAMAGNG THE 4THFL FRAMNG&LEAVNG THE 4THFL EXP1 WALL UNBRACD,ROOF JOISTS WERE MOD TO SEV FIRE DM.OWNR TO RTAIN NYSPE,DEMO ENDRSD GC&ASBESTOS GC TO IMMED 1.PE TO SBMT METHDS BY 8/14/26 TO FEU&DEP FOR REVIEW,2.UPON APPRVL |
| May 21, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL 20' OF SIDEWALK SHED AT EXPOSURE #1(FULTON ST) WITH REQUIRED 5 5' EXTENSION AT OPPOSITE ENDS TO SAFEGUARD THE PUBLIC AND PROPERTY |
| May 18, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL ACCESSIBLE OPENINGS TO SAFEGUARD PUBLIC AND PROPERTY ALSO TO PREVENT UNLAWFUL ENTRY |
| May 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESPONDING TO AN INCIDENT OBSERVED A 4-STORY MULTIPLE DWELLING BUILDING SUSTAINED FIRE DAMAGE CONSISTING OF CHARRED WOOD JOINTS, OPEN FIRE RATED WALLS, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT. THE PARAPET IS DAMAGED AT EXP#1AND ROOF IS OPEN LEAVING BUILDING EXPOSED TO ALL ELEMENTS |
| May 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | 4-STORY BUILDING SUSTAINED DAMAGES FROM FIRE. OBSERVED CHARRED WOOD JOINTS, OPEN FIRE RATED WALLS, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT. THE PARAPET IS DAMAGED AT EXP#1AND ROOF IS OPEN LEAVING BUILDING EXPOSED TO ALL ELEMENTS. AN ENGINEER'S REPORT IS REQUIRED TO CHECK STABILITY OF BUILDING, PARAPET & ALL APARTMENTS FROM FIRE |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Dec 31, 2009 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 19, 2007 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |