NYC Building Report

Brooklyn Flatlands

1149 East 52 Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-07756-0025), so they can include other buildings on the same lot.

7 records

Date Class Status Apartment Summary
Jun 28, 2022 A VIOLATION DISMISSED 1 § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Jun 28, 2022 A VIOLATION DISMISSED 1 § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Jun 28, 2022 A VIOLATION DISMISSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 14, 2022 B VIOLATION DISMISSED 1ST § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 14, 2022 A VIOLATION DISMISSED 1ST § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH,SOUTH,WEST WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 14, 2022 B VIOLATION DISMISSED 1ST § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 14, 2022 C VIOLATION DISMISSED 1ST § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM WEST AT NORTH