Brooklyn Bushwick (East)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-03434-0024), so they can include other buildings on the same lot.
4 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 8, 2026 | B | NOV SENT OUT | 3 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 8, 2026 | B | NOV SENT OUT | 3 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 8, 2026 | B | NOV SENT OUT | 3 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 8, 2026 | A | NOTICE OF ISSUANCE SENT TO TENANT | 3 | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING NORTH, EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |