Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 16, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.ON9/15/23,APPRX 8FTW X 10FT HIGH SCTION OF BRCK FACADE OUTER WYTHE @2NDFL LVL OF 1139&1141 CLLPSD ONTO SDEWALK.EXP1 FACADE BULGD/CRCKD & IN DANGER OF FRTHR CLLPSE.OWNR TO ENGAGE A NYS PE ENCLOSD CONTRCTR TO EVAL THE ENTIRE BLDG.OBTAIN PRMT TO RPAIR NO LATER THAN 10/25/23 |
| Sep 16, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.ON 9/15/23,APPRX 8FT X 10FT HIGH SECTION OF BRCK FACADE OUTER WYTHE OF 2NDFL LVL@1139 & 1141 CLLPSD ONTO SDEWALK EXP1 FACADE BULGD/CRCKD & IN DANGER OF FURTHER COLLAPSE.OWNR TO IMMED RTAIN NYS PE LIC CNTRCTR TO 1.PRFRM PRTL DEMO OF EXP1 FACADE BY HAND FRM MAN LIFT,2.INSTALL TEMP WTHRPRFNG |
| Sep 16, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FALLING BRICKS. THE STABILITY OF THE REMAINING BRICKS IS UNSTABLE AS WELL AS THE THE INTERIOR. |