DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REP REPORT |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Dec 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMM'S. 15 DAY LETTER BOROUGH COMMISIONER HAS ISSUED A 15 DAY LET TER OF INTENT TO REVOKE APPL#310029530 ON 122309 REMEDY; STOP ALL WORK, MAKE SITE SAFE CONTACT DOB |
| Sep 4, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INADEQUATE PILING DETAILS ON APPROVE PLANS, PERMIT # 310029536 INSTALLED TIMBER PILES DO NOT MATCH HELICAL DETAILS, NO SPECS FOR TIMBER PILES REMEDY:SWO SUBMIT PLANS & LOGS FOR SEP/EX ENGINEER REVIEW |