NYC Building Report

Brooklyn Brighton Beach

1120 Brighton Beach Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

63 records

Date Status Type Summary
Aug 3, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2651
Aug 3, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2652
Aug 3, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2653
Aug 3, 2000 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2654
Nov 12, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2654
Nov 12, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2653
Nov 12, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2652
Nov 12, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3P2651
Apr 17, 1998 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: FRAME SHEETROCK PARTIION CONSTRUCT- ED AT APARTMENT 3A KITCHEN WEST SIDE AND LIVING ROOM NORTH SIDE WEST SECTION REDUCE DOORS OPENING FROM APPROX. 7FT TO 2 FT. 6 INCHES WITH POCKET DOORS INSTALLED CREATES A SEPARAION REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL
Apr 8, 1998 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: RENOVATING ENTIRE BATHROOMS, PARTITIONS REMOVED TO COMBINE APARTMENTS. TWO BATHROOMS INTO ONE REMEDY: STOP ALL WORK IMMEDIATELY, OBTAIN A PERMIT FORTHWITH
Apr 3, 1998 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT: WORK NOTED"
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Dec 17, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 51)REPAIR AND RENEW CAR FLOOR