Brooklyn Borough Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 3, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 3, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 3, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.ROOF,2ND,1ST FL JOISTS RMVD W/1ST FL&PRTIAL 2NDFL JOISTS REPLACD W/COLD FORMED STEEL JOISTS.ROOF OPN&EXP2 PRTY WALL W/1103 52 ST EXPSD W/O PROPR WALL TIES/BRACNG,&WEATHER PROOFING.OWNR TO RETAIN NYSPE TO EVAL ENT BLDG&PREPARE RPAIR DWGS,INC PARTY WALL.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 2/27/23 |
| Feb 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 31, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 50 CUBIC YARDS OF BACKFILL MATERIAL.BACKFILL TO THE TOP OF EXTERIOR GRADE ELEVATION IN THE FRONT OF THE BUILDING AND PROVIDE 1:1 SOIL BERM TRANSITIONING BETWEEN EXTERIOR GRADE AND CELLAR ELEVATION |
| Jan 27, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. NOTED : OBSERVED THE ENTIRE SECOND FLOOR WAS REMOVED ,ALSO PART OF THE ENTIRE FRONT OF THE BUILDING WAS REMOVED, THEY ARE INSTALLING METAL JOIST ON THE SECOND FLOOR. THE WORK IS APPROXIMATELY 40 PERCENT COMPLETE . |