Brooklyn East Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 28, 2025 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED AT EXPOSURE 1 TO SAFEGUARD THE PUBLIC AND PROPERTY. ALSO REQUESTING TO SEE ALL OPENINGS TO SAFEGUARD THE PROPERTY FROM BEING OPEN TO THE ELEMENTS |
| Jul 26, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED WOOD FA ADE COMPONENT (APPROX. 20'X 8') HAS DETACHED FROM THE BUILDING AND COLLAPSED TO THE SIDEWALK BELOW. COCKLOFT HAS BEEN LEFT OPEN TO THE ELEMENTS AT EXP.1.(FRONT OF BUILDING). |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 25, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |