NYC Building Report

Brooklyn Williamsburg

11-15 Jackson St, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Feb 22, 2024 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Dec 1, 2021 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Apr 29, 2021 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Apr 7, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 3, 2019 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Dec 1, 2016 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
Jun 1, 2016 V*-DOB VIOLATION - DISMISSED EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED FAILURE TO PERFORM CATEGORY 5 INSPECTION
Feb 5, 2015 VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 7, 2014 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WAREH OUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPT SERVED YOU A CURABLE COMMISIONER'S ORDER (NOTICE OF VIOLATION)TO PROVIDE AN E NGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECE IVED. COMPLY PER COMMISSIONER'S ORDER
Jun 11, 2014 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL THIS BUILDING HAS A WOOD BOWSTRING TRUSS ROOF BY 60 DAYS FROM VIOLATION, HAVE NYS LICENSED PE EVAL. EACH BOWSTRING TRUSS AND BEARINGS VIA FIELD VERIFICATION, CALCULATIONS, PROBES, ETC ANY STRUCTURAL DEFICIENCIES TO BE IMMEDIATELY SHORED. REPAIR DRAWINGS TO BE FILED WITH THE DOB WITHIN 45 DAYS AFTER INSPECTION