Brooklyn East Flatbush-Remsen Village
1090 East New York Avenue, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #011724CLL31 701JF REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY NYS PROFSSNL & SUBMIT A REPORT TO FACADE VIA EMAIL BY 2/17/2024 AS OF 6/29/2026, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADE UNIT. REMEDY: COMPLY WITH DOB VIOLATION #011724CLL31701JF IMMEDIATELY |
| Jan 17, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO THE HAZARD POSED BY THE CRACKS MASONRY BRICK AT THE PARAPET LEV LEVEL AND THE LEANING PARAPET@ NORTH ELEVATION EXP#1& EAST ELEVATION EXP#2 REMEDY: IMMED RETAIN AN NYS PROFESSIONAL TO PERFORM A 100% HANDS ON INSPECTION OF THE BUILDINGS FACADE AND PARAPETS PROVIDE INSPECTION RESULTS,REPAIR PLANS&PROPOSAL TO DOBFACADES UNIT BY 2-17-24 |
| Dec 15, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 40 FT OF SIDEWALK SHED AT EXPOSURES 1, CENTERED AT THE EXTEND PARAPET WALL |
| Dec 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OF A 4 STORY BUILDING OBSERVED THE PARAPET WALL AT EXPO. # 1 HAS MISSING MORTAR AT THE TOP PART AND IS LINING INWARDS TOWARDS THE ROOF . THIS IS SAFETY HAZARD |
| Apr 29, 2021 | V*-DOB VIOLATION - DISMISSED | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Oct 7, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |